Illustration 3.5: Step 4 of 7: Installed Power
To change the installed power, refer to
Setup, Calibration, PV Array
.
Step 5 of 7: Grid code
Select the grid code to match the location of the installation. To meet medium-voltage grid re-
quirements select a grid code ending in MV.
The default setting is [undefined].
Select the grid code again, to confirm.
The setting is activated immediately.
Correct selection is essential to comply with local and national standards.
Illustration 3.6: Step 5 of 7: Grid Code