Danfoss VLT 5000 Manuel d'instructions Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 45
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
10
Pre-Installation Check
Check Motor Wiring
No power correction capacitors between drive and motor
2-speed motors must be wired for full speed
Part-winding start motors, must be wired for run.
Insure that there are no power correction capacitors between the drive and the motor.
These types of capacitors must always be located on the incoming power to the drive, never
the output of the drive.
If you are using the drive on a 2-speed motor, always use the “run” wiring configuration,
never use the “start” wiring.
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 44 45

Commentaires sur ces manuels

Pas de commentaire